What was found
DURING A-CHECK, ON NR2 ENGINE RT T/R TRANSCOWL, AFT FAIRING WAS FOUND WITH A CRACK APPROX 2.45 INCHES IN LENGTH. (DISPOSITION WAS MADE TO PERFORM REPAIR AS DESCRIBED IN PART 1 WORK INSTRUCTIONS. PERMANENT REPAIR AS DECRIBED IN PART 2 WILL BE PERFORMED AT 15,000 FLT HRS AFTER ACCOMPLISHMENT OF PART 1 OF THIS EO.