What was found
DURING INSPECTION OF DATUM ACFT IAW EO 4453A301 REV A, CRACK WAS FOUND AT 1 EA FASTENER HOLE ON AT BS 840 LT SIDE TENSION TIE (STR 10L), AFT CHANNEL. (THE DAMAGED TENSION TIE WAS REPAIRED IAW WORK STEP 10E OF PART 1 OF EO 4753B301, REV A IAW WORK STEP 10E OF PART 1 OF EO, THE TENSION TIE CRACKS THAT CANNOT BE REMOVED BY DOING THE OVERSIZE HOLE REPAIR, SHOULD BE REPAIRED AS GIVEN IN SRM 53-20-30, REPAIR 1.)