What was found
ENG 2 PART 3 OF EO6736A005 STEP 6 FAILED & PRV DID NOT CLOSE WEN BLEED SWITCH WAS TURNED TO OFF. R & R PRV CONTROLLER. OPERATIONS & LEAK CHECKED GOOD. REF AMM 36-11-19.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
ENG 2 PART 3 OF EO6736A005 STEP 6 FAILED & PRV DID NOT CLOSE WEN BLEED SWITCH WAS TURNED TO OFF. R & R PRV CONTROLLER. OPERATIONS & LEAK CHECKED GOOD. REF AMM 36-11-19.