What was found
BS 1540, RBL 3 FLOORBEAM HAS CORROSION. REMOVED CORROSION AND BLENDED AREA, EVALUATED DAMAGE, AND FOUND TO BE WITHIN ALLOWABLE LIMITS. CLEANED, TREATED, PRIMED, AND PAINTED AREA IAW AMM 51-21-03, 51-21-04, 51-24-21, AND 51-24-15</P>)
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
BS 1540, RBL 3 FLOORBEAM HAS CORROSION. REMOVED CORROSION AND BLENDED AREA, EVALUATED DAMAGE, AND FOUND TO BE WITHIN ALLOWABLE LIMITS. CLEANED, TREATED, PRIMED, AND PAINTED AREA IAW AMM 51-21-03, 51-21-04, 51-24-21, AND 51-24-15</P>)