What was found
RIGHT AC BUSS FAILED DURING DESCENT, QRH PROCEDURE RESTORED POWER WITH RT ISL ILLUMINATED. PERFORMED BITE CHECK ON THE BPCU, FOUND DP TRIPPED, MAIN BUSS, OVERLAP ZONE MESSAGE , REMOVED AND REPLACED THE RIGHT GCU, OPS CHECKED GOOD IAW AMM 24-22-02.