Service difficulty report · Connector · Boeing 7673Y0

Difficulty date
October 6, 2018
Submitted
October 11, 2018
Operation
Air carrier
Aircraft
N1181A
Make and model
Boeing 7673Y0
Aircraft serial
26206
Aircraft time
84,150 hours, 20,714 cycles
Part
Connector
Condition
Contaminated
Location
Fuel Pump
Stage of operation
TX
How discovered
O
Nature of condition
J
Precautionary procedure
O

As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.

What was found

CTR L FUEL PUMP MSG DISPLAYED AFTER ENG START, LEFT C PUMP DISPLAYED PRESSURE LIGHT. PERFORMED VOLTAGE CHECK AT LT CENTER FUEL PUMP AT PINS 2,4,6, 115VOLTS AC PERFORMED VOLTAGE CHECK AT LT FUEL OVRD PUMP CONT RELAY AT PINS A2,B,C2 115 VOLTS AC NOTED, THEN ALSO CHECKED VOLTAGE AT PINS X1 AND X2 28 VOLTS NOTED. THEN CHECKED VOLTAGE COMING OUT AT PINS A1,B1,C1 115 VOLTS AC NOTED. FOUND CONNECTOR ON LT CENTER FUEL PUMP CONTAMINATED. CLEANED CONNECTOR IAW SWPM 20-60-01 PERFORMED OPS CHECK OF LT CENTER FUEL PUMP IAW AMM 28-31-0, OPS CHECK GOOD. VOLTAGE CHECK IAW WDM 28-22-12 SHEET 1.

More about the Boeing 767-3Y0