What was found
STATUS R ENG FIRE LOOP 2 PERFORMED FIM 26-11 FT 804 PER BLOCK 103. C/W VISUAL INSPECTION OF ENG LOOP 2 AND BLEED DUCTS, NO LOOSE CONNECTIONS AND NO DAMAGE NOTED. OPS CHECK, NO FURTHER DEFECTS NOTED.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
STATUS R ENG FIRE LOOP 2 PERFORMED FIM 26-11 FT 804 PER BLOCK 103. C/W VISUAL INSPECTION OF ENG LOOP 2 AND BLEED DUCTS, NO LOOSE CONNECTIONS AND NO DAMAGE NOTED. OPS CHECK, NO FURTHER DEFECTS NOTED.