What was found
DESCENDING THRU FL 250-FL240, L ENGINE N1 & N2 SURGED APPROX 7-8%. ALSO, SEI FLASHED ON MOMENTARILY.(<P>FOR CORRECTIVE ACTION SEE ITEM M4, M5, M6, M7, M8, ACTION PLAN AP15533, & ECM 2019P-291.<BR /></P><P>LP 1033691 - M4: R/R LT PRSOV IAW AMM 36-11-09/401. OPERATIONAL TEST REQUIRED (ENGINE RUN). RAN LT ENG IAW AMM 71-00-00. TESTS GOOD.</P><P>LP 1033691 - M5: R/R DISCRETES PRINTED CIRCUIT CARD IAW IAW AMM 73-21-11/401 (M644). OPERATIONAL TEST REQUIRED. <SPAN>RAN LT ENG IAW AMM 71-00-00. TESTS GOOD.</SPAN></P><P>LP 1033691 - M6: R/R THE FOLLOWING RELAYS: K167, K141, K434, K1034, K1025 AND K785 IAW SSM 73-21-02. OPERATIONAL TEST REQUIRED. ENG RUN NORMAL IAW AMM 71-00-00.</P><P>LP 1033692 - M7: ACCOMPLISHED WIRING CHECKS PER WDM 73-21-11 AND 73-21-19. MEGGER AND CONTINUITY CHECKS OK. R/R M838 FLAP STAB POSITION MODULE PER AMM 27-58-01. OPS CHECK OK.</P><P>LP 1033692 - M8: R/R LT ISOLATION VALVE IAW AMM 36-11-04. LEAK CHECK AND TEST OK</P>)