Service difficulty report · Shutoff Valve · Boeing 767316

Difficulty date
July 27, 2019
Submitted
July 29, 2019
Operation
Air carrier
Aircraft
N1381A
Make and model
Boeing 767316
Aircraft serial
27615
Aircraft time
86,625 hours, 18,581 cycles
Part
Shutoff Valve
Condition
Malfunctioned
Location
Bleed Air Sys
Stage of operation
NR
How discovered
O
Nature of condition
J
Precautionary procedure
D

As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.

What was found

L ENG BLEED OFF EICAS. (<P>REMOVED AND REPLACED PRESSURE REGULATOR CONTROLLER IAW AMM 36-11-19. DURING OPS CHECK SAME MESSAGE OCCURRED. NO FIX. FURTHER T/S REQUIRED.<BR /></P><P>LP 1052746 - M3: SWAPPED PRV TO THE HPSOV POSITION IAW AMM 36-11-07 AND SWAPPED THE HPSOV TO THE PRV POSITION IAW AMM 36-11-18. OPS CHECK NEEDS TO BE COMPLIED WITH. P/N 802170-12 FOR BOTH PRV & HPSOV, NSN.</P><P>LP 1052747 - M4: PERFORMED OPS CHECK OF THE #1 ENGINE PRV AND HPSOV IAW AMM 36-11-07, 36-11-18. OPS CHECK AND LEAK CHECKS GOOD AT THIS TIME.</P><P>LP 1052747 - M5: INSTALLED NEW O-RING ON ELBOW FITTING FOR ENGINE #1 PRV IAW AMM 36-11-18. OPS CHECKS AND LEAK CHECKS GOOD AT THIS TIME.</P><P>LP 1052747 - M6: INSTALLED NEW O-RING ON UNION FITTING FOR THE #1 ENGINE HPSOV. OPS CHECKS AND LEAK CHECKS GOOD AT THIS TIME IAW AMM 36-11-07.</P><P>LP 1052748 - M8: INSPECTED WIRING ON THE #1 ENGINE HPSOV AND FOUND BROKEN WIRE ON THE #2 TERMINAL STUD. CRIMPED NEW RING TERMINAL ON THE #2 TERMINAL STUD HARNESS IAW SWPM 20-60-00. OPS CHECK GOOD AT THIS TIME.</P>)