What was found
ON THE FIRE PNL HANDLE, FOUR SW LIGHTS: L ENG OVHT, ENG BTL 1 DISCH, ENG BOTTLE B DISCH, AND R ENG OVHT ASSY ARE NOT WORKING PROPERLY, STUCK AND STICKING. REMOVED AND REPLACED FIRE/OVERHEAT TEST PANEL IAW AMM 26-11-01, OPS CHECK NORMAL.