What was found
FWD EQUIPMENT OVERHEAT EICAS MESSGAE ILLUMINATED AFTER DEPARTURE. IAW QRH SELECTED EQUIPMENT COOLING SWITCH TO STANDBY THEN OVRD, CLEARING THE PROBLEM. OAT WAS 117ºF, EXTENDED GROUND TIME, TAXI AND HOLD FOR TAKE OFF. OAT STILL AT 10C AT 30K FT. AFTER REACHING COOL. SPS OPS NORMAL, C/W FIM 21-58 F/T 910. OAT ABOVE 110C WITH NO DEFECTS NOTED. SYSTEM OPS CHECKED AND BITE CHECKED GOOD.