What was found
AFTER R ENG START, R GEN WAS INOP(<P>REMOVED AND REPLACED RIGHT ENG GCU PER AMM 24-22-01. OPS TEST GOOD, NO DEFECTS NOTED. ENG RUN PER AMM 71-00-00, OPS GOOD. PLACED .62 ELEC LOAD TO ISOLATE RT GEN APPROX. 5 MINS, NO FAULTS NOTED.</P>)