Service difficulty report · Engine · Boeing 7673Y0

Difficulty date
September 15, 2021
Submitted
September 17, 2021
Operation
Air carrier
Aircraft
N1181A
Make and model
Boeing 7673Y0
Aircraft serial
26206
Aircraft time
22,963 cycles
Engine
Ge CF680C2B7F
Part
Engine
Condition
Warning Message
Stage of operation
TX
How discovered
V
Nature of condition
O
Precautionary procedure
K

As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.

What was found

UPON SHUTTING DOWN LEFT ENGINE L AC BUS MESSAGE DISPLAYED REMAINED ILLUMINATED UNTIL EXT POWER SELECTED.(<P>PERFORMED FIM TASK 24-32 FT803 BLOCKS 1 AND 2 FOLLOWED BY ENGINE RUN IAW AMM 71-00-00. OPS NORMAL AT THIS TIME. NO FURTHER DEFECTS NOTED. NUSSIANCE FAULT DUE TO IMPROPER ENGINE SHUTDOWN WITHOUT EXT POWER ON OR APU POWER ON.</P>)

More about the Boeing 767-3Y0