As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
What was found
REINSTALL ALL REMOVED HYDRAULIC, PNEMAUTIC AND ELECTRIAL CONNECTORS AND LINKS DUE TO #1 ENGINE CHANGE CANCELATION. REINSTALLED ALL; HYDRAULIC; PNEUMATIC AND ELECTRICAL CONNECTORS AS PER 71-00-02. PENDING ENGINE RUN UP LEAK CHECK .PERFORMED IDLE ;LEAK CHECK PER B767-300 AMM 71-00-00.NO LEAKS NOTED , ENG OPS CHECK GOOD