What was found
SECTION48, PRESSURE DOME, CONTROL CABLES E1B AND E1A, AIR PRESSURE SEALS WITH EVIDENCE OF AIR LEAK(<P><SPAN DIR="LTR" ROLE="PRESENTATION">SECTION48, PRESSURE DOME, CO-</SPAN><SPAN DIR="LTR" ROLE="PRESENTATION">NTROL CABLES E1B AND E1A, AIR PRESSURE </SPAN><SPAN DIR="LTR" ROLE="PRESENTATION">SEALS WERE SEALED PER AMM 20-10-04-404-014</SPAN></P>)