What was found
DURING MEASURING OF THE ELECTRICAL BONDING RESISTAMCE OF AC OVERRIDE PUMP LH, AC OVERRIDE PUMP RH AND APU DC FUEL PUMP ARE OUT OF LIMITS.(<P>BOLTS AND O-RINGS WERE REPLACED AND MEASURED THE ELECTRICAL BONDING RESISTENCE OF AC OVERRIDE PUMP LH AND AC OVERRIDE PUMP RH AFTER IAW AMM 28-22-05-404-078-002 REV 139 APR 22 2023. PUMP</P> / <P>RH 0.32 MILLIHOMS, PUMP LH 0.23 MILLIOHMS, BONDING METER S/N DC005829 - 19DEC 23. MEASURE THE ELECTRICAL BONDING RESISTENCE OF APU DC FUEL PUM 0.05 MILLIOHMS OK IAW AMM 28-25-01-404-029 REV 139</P> / <P>APR 22 2023 BONDING METER S/N DC 005040 - 08NOV23</P>)