Service difficulty report · Relay · Boeing 74747UF

Difficulty date
May 10, 2024
Submitted
May 13, 2024
Operation
Air carrier
Aircraft
N475MC
Make and model
Boeing 74747UF
Aircraft serial
29252
Aircraft time
98,927 hours, 18,464 cycles
Part
Relay
Condition
Failed
Location
Outflow Valve
Stage of operation
CL
How discovered
O
Nature of condition
G
Precautionary procedure
A

As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.

What was found

CREW REPORTED VIA SATCOM DUAL OUTFLOW VALVE FAILURE.(<P>FOUND CABIN PRESS CONT RH ICU C/B PULLED AND COLLARED ON P6 PANEL (CABIN PRESS ONTR LH ICU C/B CLOSED). LH ICU C/B SHOULD HAVE BEEN PULLED AND COLLARED IAW THE LH OUTFLOW VALVE DMI 208466 ON 10MAY24 AT NKG STATION. RESTORED RH ICU C/B AND TESTED RH OUTFLOW VALVE OPERATION, OPERATIONAL CHECK NORMAL IAW AMM 21-31-00/501. DMI 208466 CURRENTLY OPEN. C/W W/O 130306, R/R RELAY 351 PER AMM 21-31-01A , OPS CHK GOOD.

More about the Boeing 747-47UF