What was found
R/H BS 860 UPPER DECK TENSION TIE 2EA HOLE FOUND 1EA CRACK AT AFT CHANNEL(<P>R/H BS 860 UPPER DECK TENSION TIE 2EA HOLE CRACK REPAIRED IAW SRM 53-20-30-2R-1 REPAIR 1 REV 101 DATE 20 JUN 2024. NO FURTHER DEFECTS NOTED</P>)
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
R/H BS 860 UPPER DECK TENSION TIE 2EA HOLE FOUND 1EA CRACK AT AFT CHANNEL(<P>R/H BS 860 UPPER DECK TENSION TIE 2EA HOLE CRACK REPAIRED IAW SRM 53-20-30-2R-1 REPAIR 1 REV 101 DATE 20 JUN 2024. NO FURTHER DEFECTS NOTED</P>)