What was found
ENG 1, BTW 10-3 O'CLOCK, V-GROOVE WITH CORROSION.(<P>ENG 1, BTW 10-3 O'CLOCK, V-GROOVE WITH CORROSION. AREA WAS CLEANED. INITIALS MEASURES WERE PERFORMED. DAMAGES WERE BLEND OUT AND REWORKS WERE FOUND WITHIN ALLOWABLE LIMITS I.A.W. AMM TASK 72-33-00-206-001 REV 143 22AUG24 AND SRM 51-10-02-0G-0 REV 127 15DEC24. CORROSION WAS CLEAN OUT EVALUATED AND FOUND WITHIN ALLOWABLE DAMAGE LIMITS.</P>)