As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
What was found
NR 3 FUEL AFT BOOST PUMP FOUND CUTOUT DOUBLER CORROSION. DOUBLER FABRICATED AS PER BOEING DWG 65B19560 AND PL, NEW DOUBLER HOLES TRANSFERRED AS PER SRM 51-40-05 AND NEW DOUBLER INSTALLED AS PER SRM 51-40-02. NO FURTHER DEFECTS NOTED</P>)