What was found
INSPECTION TYPE:C1 CTR FUSE SHEAR TIE CRACKED ON TOP OF FRAME STA 680 BL 0. REMOVED BRACKET DRILLED UP AND INSTALLED NEW BRACKET IAW DC8 SRM 51-1-8 AND DAC DWG 615535.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
INSPECTION TYPE:C1 CTR FUSE SHEAR TIE CRACKED ON TOP OF FRAME STA 680 BL 0. REMOVED BRACKET DRILLED UP AND INSTALLED NEW BRACKET IAW DC8 SRM 51-1-8 AND DAC DWG 615535.