Service difficulty report · Power Supply · Doug MD11F

Difficulty date
July 23, 2003
Submitted
July 25, 2003
Operation
Air carrier
Aircraft
N250UP
Make and model
Doug MD11F
Part
Power Supply
Condition
Failed
Location
Emergency Light
Stage of operation
IN
How discovered
9
Nature of condition
O
Precautionary procedure
K

As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.

What was found

EMERGENCY POWER TEST FAIL. POWERED DOWN A/C, REPOWERED, PERFORMED RTS OF EPCU. TEST PASSED & EMERGENCY POWER TEST PASSED.

More about the Doug MD-11F