What was found
INSPECTION TYPE: C CTR TANK FRONT SPAR UPPER CHORD SHEAR TIE FOUND CRACKED AT RBL 35. SHEAR TIE FTG REPLACED IAW SRM 51-10-01 P. 8.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
INSPECTION TYPE: C CTR TANK FRONT SPAR UPPER CHORD SHEAR TIE FOUND CRACKED AT RBL 35. SHEAR TIE FTG REPLACED IAW SRM 51-10-01 P. 8.