What was found
INSPECTION TYPE:C3 AFT PRESSURE BULKHEAD AFT SIDE 3RD J-BEAM UP FROM BOTTOM CRACKED AT BO BOTH UPPER & LOWER EXISTING DOUBLERS AT CENTERLINE WITH UPPER FLANGE HANS SHEARED & LOOSE FASTENERS. NDT VERIFIED CRACK IN BOTH UPPER & LOWER J-BEAM DOUBLERS IS 2 INCHES IN LENGTH. REMOVED EXISTING REPAIR DOUBLERS. NDT VERIFIED CRACK IN J-BEAM IS TERMINATED AT EXISTING STOPDRILLS. FABRICATED AND INSTALLED TWO REPAIR DOUBLERS IAW EO DC8-5310-6598-C.