Service difficulty report · Windshield · Boeing 747200

Difficulty date
September 12, 2005
Submitted
September 16, 2005
Operation
Air carrier
Aircraft
N523UP
Make and model
Boeing 747200
Aircraft serial
22381
Part
Windshield
Condition
Delaminated
Location
Cockpit
Stage of operation
IN
How discovered
9
Nature of condition
O
Precautionary procedure
K

As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.

What was found

INSPECTION TYPE:N/A F/O R1 WINDOW HAS CHIPPING AND CRACKING IN MAIN GLASS PLIES. COMPLETED R1 REMOVAL & INSTALLED NEW R1 REF TO MM 56-11-01 UP TO STEP 6.D. FIRST TORQUE COMPLETED. ITEM STEPS 6D THRU J NEED TO BE C/W. STEPS ARE FOR INSTALLATION OF SEALANT. WINDSHIELD REQUIRES 3RD FINAL RE-TORQUE PER MM 56-11-01 STEP 9. DFRD 3RD FINAL WINDSHIELD RE-TORQUE PER AMC CONTROL D309948. ASSIGNED RETORQUE TO BE C/W WITHIN 9 DAYS PER AMC. ORIG TORQUE LP 372189 ITEM 1, 2ND TORQUE LP 372192 ITEM 3. ACCOMPLISHED STEPS 6 THRU D. MM 56-11-01 PG 417-419 SEALANT INSTALLATION.