What was found
INSPECTION TYPE: C2, AFT PRESSURE BULKHEAD CRACKED AT APPROX RBL 26 & L12R. REMOVED EXISTING DOUBLER AT SITE. CUT OUT DAMAGE, NDT VERIFIED. FAB 2EA -9 FILLERS -25 DOUBLER, -27 DOUBLER (7075T6-.063), -19 FILLER (SHT7075T6-.090), -11 FILLER (7075T6 -.063). TREAT, PRIME, INSTALL & SEALED ALL REF SRO8530007, SRM51-1-8, MM20-30-00, NDT/SPM06-10-01.001.