What was found
AFT CARGO COMPT RT STA 1760 IN BETWEEN RBL 7 AND RBL 25 FLOORBEAM UPPER CHORD FOUND CORROSION. CORROSION BLEND OUT 0.025" BY 1.5" BY 10". AFT CARGO COMPT BS 1760 BETWEEN LBL 16 TO RBL 16 FLOORBEAM UPPER REPAIRED AS PER SRM 51-40-04 FIG 2 RBL 16 TO RBL 25 CORROSION REMOVED AND REPROTECTED AS PER SRM 51-10-01 AND 51-10-02 BLEND OUT DEPTH 0.006" WIDTH 1" AND LENGTH 8" WITHIN SRM 53-10-01 FIG 1 LIMITATION.