As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
What was found
R1 WINDOW WATER INGRESS AT BUS BAR. *SUPPLEMENTAL SDR* REMOVED AND REPLACED F/O'S NR 1 WINDOW UP TO STEP 20 (REQUIRES INSPECTION TORQUE) & HEATING SYSTEM CHECK AND WINDOW WIPER OPERATIONAL CHECK. STEPS 26&27 ARE COMPLETED PER AMM 56-11-01-4. REF LP 59803 TORQUED WINDOW HEAT TERMINALS PER MM 56-11-0-4. COMPLETED INSTALLATION OF R1 WINDSHIELD PER MM 56-11-01-4.