What was found
DURING 'D' CHECK, MAINTENANCE FOUND A CRACK IN THE NR 6 SLAT MOST INBOARD RIB (SEAL RETAINER RIB AT SLAT STATION 120). MAINTENANCE REMOVED THE CRACKED RIB, INSTALLED NEW RIB AND FINAL INSTALLATION IAW SRM 51-30-2 AND 51-30-5.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
DURING 'D' CHECK, MAINTENANCE FOUND A CRACK IN THE NR 6 SLAT MOST INBOARD RIB (SEAL RETAINER RIB AT SLAT STATION 120). MAINTENANCE REMOVED THE CRACKED RIB, INSTALLED NEW RIB AND FINAL INSTALLATION IAW SRM 51-30-2 AND 51-30-5.