What was found
DURING 'D' CHECK, MAINTENANCE FOUND CORROSION ON TOP CENTER OF SEAT TRACK AT STATION 948, BL 0. MAINTENANCE REPLACED THE SEAT TRACK FROM BS 870 TO 960, BL 0. ALL WORK DONE PER SRM 53-10-1, 51-10-2, 53-10-5 AND 51-30-2.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
DURING 'D' CHECK, MAINTENANCE FOUND CORROSION ON TOP CENTER OF SEAT TRACK AT STATION 948, BL 0. MAINTENANCE REPLACED THE SEAT TRACK FROM BS 870 TO 960, BL 0. ALL WORK DONE PER SRM 53-10-1, 51-10-2, 53-10-5 AND 51-30-2.