What was found
WHILE IN FOR C-CHECK, MAINTENANCE FOUND CORROSION ON UPPER END OF VERTICAL STIFFENER AT STA 1213 LBL 5 WL 174. MAINTENANCE FABRICATED NEW STIFFENER AND INSTALLED PER SRM 51-30-2 BOEING DRAWING 65-25992.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
WHILE IN FOR C-CHECK, MAINTENANCE FOUND CORROSION ON UPPER END OF VERTICAL STIFFENER AT STA 1213 LBL 5 WL 174. MAINTENANCE FABRICATED NEW STIFFENER AND INSTALLED PER SRM 51-30-2 BOEING DRAWING 65-25992.