What was found
WHILE IN FOR SI CHECK, MAINTENANCE FOUND CORROSION (C53-224-01.05-01), ON FLOORBEAM STA 400 RBL 25 TO RBL 60 WL 208, LOWER SIDE OF UPPER CHORD. REMOVED CORROSION, FOUND OUT OF LIMIT, REMOVED DAMAGE AREA, FABRICATED T-CHORD. FINAL INSTALLATION PER SRM 53-10-8, 53-30-2, 51-10-6 AND 53-10-1.