What was found
WHILE IN C-CHECK, MAINTENANCE FOUND CRACK AND CORROSION IN B-BAY BIN, AFT BULKHEAD, FS 640, LBL 24, LT TUNNEL VERTICAL ANGLE NEXT TO MAIN CARGO FLOOR. INSTALLED REPAIR PER SRM 53-2-0.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
WHILE IN C-CHECK, MAINTENANCE FOUND CRACK AND CORROSION IN B-BAY BIN, AFT BULKHEAD, FS 640, LBL 24, LT TUNNEL VERTICAL ANGLE NEXT TO MAIN CARGO FLOOR. INSTALLED REPAIR PER SRM 53-2-0.