What was found
WHILE IN DALFORT FOR C-CHECK, MAINTENANCE FOUND CORROSION ON THE AFT FUSELAGE LONGERON AT STATION 1645 TO 1700 AND LONGERON 35R. MAINTENANCE CUT OUT DAMAGED AREA, INSTALLED REPLACEMENT LONGERON PER SRM 53-2-2 AND FABRICATED REPAIR SPLICE AND INSTALLED PER SRM 53-1-22, 51-1-20D.