What was found
MAINTENANCE REPORTED, CAPTAINS ESCAPE ROPE WILL NOT REMAIN SECURE IN STOWED POSITION. PERFORMED INTERIM REPAIR TO CAPT'S ESCAPE ROPE COVER AND DEFERRED PER EO DC8-2510-7055 A FINAL REPAIR REQUIRED PRIOR TO FIRST FLIGHT ON 3-4-96.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
MAINTENANCE REPORTED, CAPTAINS ESCAPE ROPE WILL NOT REMAIN SECURE IN STOWED POSITION. PERFORMED INTERIM REPAIR TO CAPT'S ESCAPE ROPE COVER AND DEFERRED PER EO DC8-2510-7055 A FINAL REPAIR REQUIRED PRIOR TO FIRST FLIGHT ON 3-4-96.