What was found
INSPECTION TYPE N/A, INFLIGHT HAD HYD A-SYS OVERHEAT. FOLLOWED CHECKLIST, TURNED PUMPS OFF AFTER OVERHEAT EXT, TURNED PUMPS BACK ON AND GOT 200 LBS PRESS PER PUMP. A TOTAL OF 500 PSI WAS ATTAINED WITH BOTH PUMPS, QTY WAS GOOD. PROCEEDED WITH LOSS OF HYD SYS-A CHECKLIST. WHILE MANUAL EXTENDING FLAPS THE OUTBOARDS WOULD NOT EXTEND, GOT ALL LEADING EDGE DEVICES. REMOVED AND REPLACED HYDRAULIC SYS-A MODULAR IAW MM 29-11-00, LEAKED CHECKED GOOD. (P/N 65-17821-14) (S/N 2381A) ON, (P/N MR29108-60) OFF.