What was found
INSPECTION TYPE C-CK, STA 25 FLOOR SUPPORT CORRODED CUSP TO CUSP. REMOVED DAMAGED FLOOR SUPPORT AT STA 25 CUSP TO CUSP, FAB NEW SUPPORT IAW DC8 53-3-2 AND DOUGLAS DWG 5888367. ALODINED AND PRIMED FLOOR SUPPORT IAW DC8 SRM 51-1-8. INSTALLED FLOOR SUPPORT IAW DC8 SRM 51-1-21, 51-1-20D, 51-1-21A.