What was found
INSPECTION TYPE-D, NR 3 MAIN TANK AT THE XRS 74 BULKHEAD STRINGER 51 AFT ATTACH FITTING IS CRACKED. REMOVED AND REPLACED FITTING IAW SRM 51-1-21.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
INSPECTION TYPE-D, NR 3 MAIN TANK AT THE XRS 74 BULKHEAD STRINGER 51 AFT ATTACH FITTING IS CRACKED. REMOVED AND REPLACED FITTING IAW SRM 51-1-21.