What was found
INSPECTION TYPE:SI L/W FUEL TANK RIB UPPER CHORD AT WS 491, STR 15 IS CRACKED AT FASTENER HOLE. REMOVED AND REPLACED RIB UPPER CHORD PER BAC DWG 65-16249.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
INSPECTION TYPE:SI L/W FUEL TANK RIB UPPER CHORD AT WS 491, STR 15 IS CRACKED AT FASTENER HOLE. REMOVED AND REPLACED RIB UPPER CHORD PER BAC DWG 65-16249.