What was found
INSPECTION TYPE:C3 NR 2 MAIN TANK, INBD SIDE OF THE XRS 74 BULKHEAD, THE FWD STR 51 END FITTING IS CRACKED. REMOVED AND REPLACED THE FITTING IAW SRM 51-1-20D AND 51-3-0.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
INSPECTION TYPE:C3 NR 2 MAIN TANK, INBD SIDE OF THE XRS 74 BULKHEAD, THE FWD STR 51 END FITTING IS CRACKED. REMOVED AND REPLACED THE FITTING IAW SRM 51-1-20D AND 51-3-0.