What was found
PIT - FOUND BEAM CORRODED .5 INCH BY .75 INCH, RBL 18 AND 368. CORROSION LEVEL 1, TASK NR C53-107-02. CLEANED CORROSION, TREATED AND PRIMED PER SRM 51-10-02. (M)
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
PIT - FOUND BEAM CORRODED .5 INCH BY .75 INCH, RBL 18 AND 368. CORROSION LEVEL 1, TASK NR C53-107-02. CLEANED CORROSION, TREATED AND PRIMED PER SRM 51-10-02. (M)