What was found
PIT - Q1 - TOP COMPOSITE LAYER, 2 INCHES X 1 INCH AREA DAMAGE, RUDDER LT SIDE 95.5 INCHES FROM BOTTOM AND 20 INCHES FWD OF T/E. PREPARED AREA, LIGHT SANDING, INSTALLED MULTI LAYER REPAIR IAW SRM AND EA.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
PIT - Q1 - TOP COMPOSITE LAYER, 2 INCHES X 1 INCH AREA DAMAGE, RUDDER LT SIDE 95.5 INCHES FROM BOTTOM AND 20 INCHES FWD OF T/E. PREPARED AREA, LIGHT SANDING, INSTALLED MULTI LAYER REPAIR IAW SRM AND EA.