What was found
PIT - Q6 - MAIN LANDING GEAR FG; INSTALLATION OF REAR SPAR FATIGUE PLATE; INSTALLATION OF REAR SPAR FATIGUE PLATE; LT REAR SPAR UPPER CHORD BETWEEN WBL 150 AND 126. FABRICATED DOUBLER AND INSTALLED IAW EA 79629. (K)
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
PIT - Q6 - MAIN LANDING GEAR FG; INSTALLATION OF REAR SPAR FATIGUE PLATE; INSTALLATION OF REAR SPAR FATIGUE PLATE; LT REAR SPAR UPPER CHORD BETWEEN WBL 150 AND 126. FABRICATED DOUBLER AND INSTALLED IAW EA 79629. (K)