What was found
BS 500A - 500B, BETWEEN S27R & 28R HAS CORROSION. REMOVED, FABRICATED & INSTALLED NEW DOUBLER PER T/R 20-00-02; CORR TASK C53-208-01.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
BS 500A - 500B, BETWEEN S27R & 28R HAS CORROSION. REMOVED, FABRICATED & INSTALLED NEW DOUBLER PER T/R 20-00-02; CORR TASK C53-208-01.