What was found
CLT - Q2 - MAJOR REPAIR - LEVEL 2 EXFOLIATION CORROSION ON FLOORBEAM UPPER T-CAP AT BS 344, LBL 19 TO RBL 8. REPAIRED FLOORBEAM UPPER TEE CAP AT BS 344, LBL 19 TO RBL 8 IAW SRM 53-30-51.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
CLT - Q2 - MAJOR REPAIR - LEVEL 2 EXFOLIATION CORROSION ON FLOORBEAM UPPER T-CAP AT BS 344, LBL 19 TO RBL 8. REPAIRED FLOORBEAM UPPER TEE CAP AT BS 344, LBL 19 TO RBL 8 IAW SRM 53-30-51.