What was found
CLT - Q5 - MAJOR REPAIR - FUSELAGE FRAME CRACKED AT BS 747, BETWEEN S8L & S9L. REPAIRED FUSELAGE FRAME AT BS 747, BETWEEN S8L & S9L TYPICAL REPAIR 53-10-20E.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
CLT - Q5 - MAJOR REPAIR - FUSELAGE FRAME CRACKED AT BS 747, BETWEEN S8L & S9L. REPAIRED FUSELAGE FRAME AT BS 747, BETWEEN S8L & S9L TYPICAL REPAIR 53-10-20E.