What was found
CLT - Q3 - MAJOR REPAIR - LEVEL 2 EXFOLIATION CORROSION ON FLOORBEAM T-CAP AT BS 947, RBL 12. REPAIRED FLOORBEAM T-CAP AT BS 947, RBL 12 IAW TYPICAL REPAIR 53-15-01B & B737 SRM 53-10-51.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
CLT - Q3 - MAJOR REPAIR - LEVEL 2 EXFOLIATION CORROSION ON FLOORBEAM T-CAP AT BS 947, RBL 12. REPAIRED FLOORBEAM T-CAP AT BS 947, RBL 12 IAW TYPICAL REPAIR 53-15-01B & B737 SRM 53-10-51.