What was found
PIT - FPBH - MAJOR REPAIR - CRACKS AROUND EXISTING TOOLING HOLES ON VERTICAL BEAM DOUBLER AT BS 180, WL 190, RBL 5.7. REPAIRED VERTICAL BEAM DOUBLER AT BS 180, WL 190, RBL 5.7 IAW US AIRWAY EA 113646.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
PIT - FPBH - MAJOR REPAIR - CRACKS AROUND EXISTING TOOLING HOLES ON VERTICAL BEAM DOUBLER AT BS 180, WL 190, RBL 5.7. REPAIRED VERTICAL BEAM DOUBLER AT BS 180, WL 190, RBL 5.7 IAW US AIRWAY EA 113646.