What was found
SAL - Q2 - MAJOR REPAIR - LEVEL 2 GALVANIC CORROSION ON FLOORBEAM UPPER FLANGE AT BS 986.5 BETWEEN LBL 47 TO RBL 47. REPAIRED FLOORBEAM UPPER FLANGE AT BS 986.5 BETWEEN LBL 47 TO RBL 47 IAW TYPICAL REPAIR 53-10-05B.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
SAL - Q2 - MAJOR REPAIR - LEVEL 2 GALVANIC CORROSION ON FLOORBEAM UPPER FLANGE AT BS 986.5 BETWEEN LBL 47 TO RBL 47. REPAIRED FLOORBEAM UPPER FLANGE AT BS 986.5 BETWEEN LBL 47 TO RBL 47 IAW TYPICAL REPAIR 53-10-05B.