What was found
SAL - Q2 - MAJOR REPAIR - LEVEL 2 GALVANIC CORROSION ON SUPPORT ZEE BETWEEN BS 986.5 TO BS 1016, RBL 32. REPLACED SUPPORT ZEE BETWEEN BS 986.5 TO BS 1016, RBL 32 IAW B737 SRM 51-40-02 & 51-10-02.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
SAL - Q2 - MAJOR REPAIR - LEVEL 2 GALVANIC CORROSION ON SUPPORT ZEE BETWEEN BS 986.5 TO BS 1016, RBL 32. REPLACED SUPPORT ZEE BETWEEN BS 986.5 TO BS 1016, RBL 32 IAW B737 SRM 51-40-02 & 51-10-02.